Introductions
Report on DWT update to MRGCD Board and discussion of letters
and other input received from Rio Grande Boulevard, Los Poblanos
and Campbell Rd. Neighborhoods. (Yasmeen lead)
Reviewing DWT Steering Committee listserve and process for adding/removing
names (Claude)
Update on RFP process, contract and schedule for North Valley
Pilot Project Design Workshop (Becky)
"Charrette 101" prep. and structure of the design workshop
(Claude and Becky lead)
Outreach plan for Design Workshop and assignment and schedule
of tasks (Attila lead)
Interface with affected agencies/partners, neighborhood orgs.
and neighbors
Assembling e-mail notification and mail lists
Contract for DWT web-based outreach using NPS funds (Yasmeen and
Attila)
Materials to be produced and/or distributed prior to the workshop,
including workshop flyer, DWT survey, updated FAQs, What is a
design workshop flyer and draft version of Action Plan (Available
for review by public and DWT partners)?
Pilot project identification signs (Yasmeen and Jake)
Discussion of previous idea to pick a very small area of pilot
project to demo. some different, temporary trail surfaces and
get public input before or at workshop
Plan and schedule for working with the design workshop contractor
(Becky lead)
Los Vecinos South Valley Pilot Project Walking Loop Draft Brochure
(Irma)
South Valley Project Legislative funds status (Irma and Becky)
Walk to School Day October (South Valley)
Acequia of Lights December (North and South Valley)